Which draft estimates already have a send record for this revision?
Check the current estimate revision against your outbound records before treating a draft as unsent. In this fictional queue, one draft already has a matching send record by 10:00. A second has a send for an older revision only at that cutoff.
How to run the check
- Take a dated snapshot of draft estimates. Keep estimate ID, revision and status on each row. Use authorized outbound events that record the same identifiers.
- For each draft, find a send with the same ID and revision at or before the cutoff. Report an older revision separately and leave missing IDs or unclear matches in review.
- Keep the send event alongside the estimate. Use separate evidence for delivery, acceptance or authorization to contact.
Fictional example
| Estimate | Revision | Status |
|---|---|---|
| E1 | v2 | Draft |
| E2 | v2 | Draft |
| E3 | v2 | Accepted |
| E4 | Draft |
| Estimate | Revision | Event | Time |
|---|---|---|---|
| E1 | v2 | Sent | 09:00 |
| E2 | v1 | Sent | 09:10 |
| E2 | v2 | Sent | 11:15 |
| E3 | v2 | Sent | 09:20 |
What the records show
Status!A2:C2 and Events!A2:D2 match E1 v2 before 10:00. E2 v1 was sent at 09:10, and the E2 v2 event is outside the cutoff. E3 is accepted and outside the draft queue. E4 lacks a revision and needs review. The figures and records are fictional.
Sources
Which estimate amount has delivery evidence?
A matching send record is a good start. If the customer questions the amount, check the document version retained on the last confirmed delivery. The current estimate may have changed, or a later resend may have bounced.
Use the estimate ID, attachment revision, message ID, provider event and event timestamp. Keep the document’s editable send date in a separate column. Some tools preserve the PDF as it looked when it was sent if a PDF was attached. If the latest confirmed delivery lacks attachment-version evidence, leave the delivered amount open. Jobber communication history documentation · STEL Order release notes
| Fictional estimate | Evidence by November 20, 23:59 UTC | Amount supported by the retained file |
|---|---|---|
| Q11 | Revision 1 delivered. The later revision 2 attempt bounced. | USD 500 |
| Q12 | Provider records delivery. The attachment revision is missing. | Unresolved |
| Q13 | Only a bounced attempt is visible. | Unresolved |
Compare Quotes!A2:D3 with Dispatch!A2:F2 and Dispatch!A5:F5. Q11’s current revision is USD 650, or USD 150 above the USD 500 version supported at the first cutoff. The successful resend in Dispatch!A6:F6 on November 21 brings the delivered amount to USD 650 at the later cutoff. The Q12 and Q13 events are in Dispatch!A3:F4. Establishing delivery does not determine whether the customer approved the quote.
Download the fictional revisions and provider status records. Open the CSVs as Quotes and Dispatch. Compare both cutoff times without changing the current estimate rows.