How to check race timer fees after a bundle catch-up payout
After the second payout, USD 1 still lacks payment evidence for bundle B8’s 5K fee. The overall expected amount is USD 11, and the cumulative payout detail supports USD 10. Match each fee to its bundle and race before closing the review.
The records and amounts below are fictional. The expected results were checked independently. Live Jolene.pro verification for this example is pending.
Expected
| Bundle | Race | FeeUSD |
|---|---|---|
| B7 | 5K | 3 |
| B7 | 10K | 5 |
| B8 | 5K | 3 |
Payout
| Bundle | Race | PaidUSD | Payout | LineID |
|---|---|---|---|---|
| B7 | 5K | 3 | P1 | L1 |
| B7 | 10K | 5 | P2 | L2 |
| B8 | 5K | 2 | P2 | L3 |
Run the check
Save the contract or approved fee schedule and the payout detail for one timer and currency. Give the review a cutoff. These fictional tables assume all three fees are due and the second payout has settled.
Check Payout!E2:E4 for repeated line IDs before summing. A repeated L3 must be held for review or excluded with documented authority. Both B7 and B8 have a 5K race, so race name alone cannot identify the fee.
For each Expected row, group accepted payout lines by Bundle and Race through the selected payout. With all listed lines unique and P2 included, =SUMIFS(Payout!$C$2:$C$4,Payout!$A$2:$A$4,A2,Payout!$B$2:$B$4,B2) yields 3, 5 and 2. Subtract that from Expected column C to obtain 0, 0 and 1.
Through P1, only USD 3 is evidenced. Through P2, the cumulative amount is USD 10. Cite Expected!A4:C4 and Payout!A4:E4 for the remaining USD 1. Record payment status and settlement references separately where the source includes them.
Review before using the result
RunSignup’s November 16 release describes fees for each race in a bundle and catch-up fees intended for the next payout. The bundle help example concerns race-to-race allocation. Confirm that the actual timer detail or an authorized crosswalk exposes the keys this check needs.
A missing line in an incomplete export leaves payment unresolved. Contract changes, reversals, pending payouts and refunds need their own evidence before deciding whether an amount is still due.
A question to try in Jolene.pro
Compare expected timer fees with the accepted payout lines through P2. Which bundle and race still differ, and which source rows support the difference?