Check dates for missing records for temperature inspections (Homebrewers using Brewfather)
A flat chart can bridge a missing reading when the export skips several checks.
Category
A flat chart can bridge a missing reading when the export skips several checks.
Compare production batches by bean lot and retain both green input weight and roasted output weight.
The largest confirmed shortfall is 1,000 on P-018 in Tasting packs.
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
The roasted weight on the plan and the grams packed into orders are recorded at different points in the day.
Overall, Morning batch shows 50% and Afternoon batch shows 53.33%. The ordering changes when you compare within each setting.
Within Profile A, Morning batch has 4 Yes results out of 5. Afternoon batch has 7 out of 10.
The same bean lot can appear under different roast profiles in a single production week.
LOG-012 has a basis but no measured amount. LOG-016 has a measured amount but no basis.
Lot Marigold records the most roasted weight g on complete rows. Lot Cobalt has the highest g/g figure.