Everyday DataHelp ArticlesMaking & Craft

Check dates for missing records for temperature inspections (Homebrewers using Brewfather)

A flat chart can bridge a missing reading when the export skips several checks.

About this example. The example reviews weights, dates and inventory. The figures do not establish that food or a drink is safe to prepare, store or serve. Follow applicable food safety guidance and check labels and storage conditions directly.

Prepare the records

Keep the fermentation readings on a schedule sheet with one ID per planned check. The log stores what was recorded. Use both sheets to calculate coverage against planned dates.

  • Schedule uses Check ID, Group, Scheduled date. The example has 36 data rows.
  • Log uses Check ID, Log date, Status, Temperature Celsius. The example has 30 data rows.

The sample uses fictional rows and prepared columns. If you start with a platform export, consult Brewfather fermentation log exports and map the available columns before using this example.

Check the workbook

  1. Check uniqueness and pair Schedule and Log by Check ID. Sort within each group by scheduled date.
  2. Separate absent log IDs, explicitly skipped checks, blank measured values and measured zeros.
  3. Count usable numeric records and report coverage. If using a time chart, keep a gap where the measurement is missing.

Ask Jolene.pro

Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.

Match the fermentation readings to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.

For a second pass:

Find skipped checks, recorded rows with blank temperature celsius and measured zeros. Give their IDs and dates. Keep the separate list of scheduled checks that have no log row.

Confirm the result

Pale ale has a run of three missing entries from 2026-09-06 to 2026-09-08. The log separates 1 explicitly skipped check, 1 row with a blank value and 0 recorded zeros. Start with Schedule, rows 7–9 and Log, rows 6, 13. The separate answer key gives the expected details for both questions.

View the fictional source tables

Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.

Schedule

Excel row Check ID Group Scheduled date
2 CHECK-001 Pale ale 2026-09-01
3 CHECK-002 Pale ale 2026-09-02
4 CHECK-003 Pale ale 2026-09-03
5 CHECK-004 Pale ale 2026-09-04
6 CHECK-005 Pale ale 2026-09-05
7 CHECK-006 Pale ale 2026-09-06
8 CHECK-007 Pale ale 2026-09-07
9 CHECK-008 Pale ale 2026-09-08
10 CHECK-009 Pale ale 2026-09-09
11 CHECK-010 Pale ale 2026-09-10
12 CHECK-011 Pale ale 2026-09-11
13 CHECK-012 Pale ale 2026-09-12
14 CHECK-013 Porter 2026-09-01
15 CHECK-014 Porter 2026-09-02
16 CHECK-015 Porter 2026-09-03
17 CHECK-016 Porter 2026-09-04
18 CHECK-017 Porter 2026-09-05
19 CHECK-018 Porter 2026-09-06
20 CHECK-019 Porter 2026-09-07
21 CHECK-020 Porter 2026-09-08
22 CHECK-021 Porter 2026-09-09
23 CHECK-022 Porter 2026-09-10
24 CHECK-023 Porter 2026-09-11
25 CHECK-024 Porter 2026-09-12
26 CHECK-025 Wheat beer 2026-09-01
27 CHECK-026 Wheat beer 2026-09-02
28 CHECK-027 Wheat beer 2026-09-03
29 CHECK-028 Wheat beer 2026-09-04
30 CHECK-029 Wheat beer 2026-09-05
31 CHECK-030 Wheat beer 2026-09-06
32 CHECK-031 Wheat beer 2026-09-07
33 CHECK-032 Wheat beer 2026-09-08
34 CHECK-033 Wheat beer 2026-09-09
35 CHECK-034 Wheat beer 2026-09-10
36 CHECK-035 Wheat beer 2026-09-11
37 CHECK-036 Wheat beer 2026-09-12

Log

Excel row Check ID Log date Status Temperature Celsius
2 CHECK-001 2026-09-01 Recorded 17.6
3 CHECK-002 2026-09-02 Recorded 18
4 CHECK-003 2026-09-03 Recorded 18.4
5 CHECK-004 2026-09-04 Recorded 18.8
6 CHECK-005 2026-09-05 Skipped
7 CHECK-009 2026-09-09 Recorded 18.4
8 CHECK-010 2026-09-10 Recorded 18.8
9 CHECK-011 2026-09-11 Recorded 19.2
10 CHECK-012 2026-09-12 Recorded 19.6
11 CHECK-013 2026-09-01 Recorded 18.6
12 CHECK-014 2026-09-02 Recorded 19
13 CHECK-015 2026-09-03 Recorded, value blank
14 CHECK-016 2026-09-04 Recorded 19.8
15 CHECK-017 2026-09-05 Recorded 20.2
16 CHECK-018 2026-09-06 Recorded 20.6
17 CHECK-019 2026-09-07 Recorded 18.6
18 CHECK-021 2026-09-09 Recorded 19.4
19 CHECK-023 2026-09-11 Recorded 20.2
20 CHECK-024 2026-09-12 Recorded 20.6
21 CHECK-025 2026-09-01 Recorded 19.6
22 CHECK-026 2026-09-02 Recorded 20
23 CHECK-027 2026-09-03 Recorded 20.4
24 CHECK-028 2026-09-04 Recorded 20.8
25 CHECK-029 2026-09-05 Recorded 21.2
26 CHECK-030 2026-09-06 Recorded 21.6
27 CHECK-031 2026-09-07 Recorded 19.6
28 CHECK-032 2026-09-08 Recorded 20
29 CHECK-034 2026-09-10 Recorded 20.8
30 CHECK-035 2026-09-11 Recorded 21.2
31 CHECK-036 2026-09-12 Recorded 21.6

More spreadsheet examples for Homebrewers using Brewfather.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.