What Happened Between Two Entries in Your Bonsai Bench Log?
The log separates 1 explicitly skipped check, 1 row with a blank value and 1 recorded zero.
Category
The log separates 1 explicitly skipped check, 1 row with a blank value and 1 recorded zero.
Maple bench has a run of three missing entries from 2026-09-11 to 2026-09-15.
The notebook records the trees you worked on, but the planned bench checks include several other dates.
Keep plant identities and dated care entries together as pots move between rooms.
Small pots has 4 in “Occupied stock.” The shortage would change from 5 to 1 if those quantities became usable.
Small pots has 9 available against 14 committed. The shortfall is 5.
The shelf count includes pots still holding plants and three in need of cleaning.
In Small pots, the median wait from Checked to Prepared is 4 days. From Prepared to Repotted, it is 4 days.
11 of 24 records are open on October 1, 2026. WORK-001 has waited 27 calendar days since its last logged stage.
Several pots are ready but the labels and materials are still in a different room.