Which Bonsai Trees Have Gaps in Their Work History?
The notebook records the trees you worked on, but the planned bench checks include several other dates.
The workbook uses fictional records. Maple bench has a run of three missing entries from 2026-09-11 to 2026-09-15.
What the records show
The longest run is CHECK-006, CHECK-007, CHECK-008. All three checks are on the calendar and none has a matching Log row. There are 6 scheduled checks with no entry across the workbook. A visual line passing through those dates can make a continuous trend look more certain than the readings are.
| Group | Scheduled | Has log row | Numeric values | No log row |
|---|---|---|---|---|
| Maple bench | 12 | 9 | 8 | 3 |
| Juniper bench | 12 | 10 | 9 | 2 |
| Elm bench | 12 | 11 | 11 | 1 |
Source in the sample: Schedule, rows 7–9.
What to check next
Use the schedule date, rather than the next logged timestamp, to identify what was due. Recheck the original diary or export before deciding why the gap happened. Identify where records need a follow-up visit.
Try the same review in Jolene.pro using a workbook you already keep.
Match the bench schedule to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
See the workbook method and fictional source tables.
More spreadsheet examples for Bonsai enthusiasts.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.
Try Jolene.pro with a workbook you already use.