Are all the sheet-music parts available for this edition?
There are two ready ED1 parts and one gap. The on-shelf Horn 2 is for ED2, and the ED1 copy is checked out.
Category
There are two ready ED1 parts and one gap. The on-shelf Horn 2 is for ED2, and the ED1 copy is checked out.
Track shoots, selects and delivered work by shoot ID, with editing effort attached when available.
The largest confirmed shortfall is 8 on P-018 in Events.
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
Extra images on one gallery can hide a short delivery on another.
In Portraits, the median wait from Captured to Selected is 4 days. From Selected to Delivered, it is 5 days.
11 of 24 records are open on October 1, 2026. WORK-001 has waited 26 calendar days since its last logged stage.
The images are backed up but some galleries are still sitting in the selects folder.
LOG-012 has a basis but no measured amount. LOG-016 has a measured amount but no basis.
Portraits records the most editing time min on complete rows. Events has the highest min/image figure.