Jolene.pro

How to Check a Renovation Budget When a Quote Is Missing

Your renovation totals $2,008 so far against a $2,116 budget. The electrical quote is still blank. Before you accept the next price, calculate how much the known work has already used and leave the missing quote visible.

Set up the budget columns

Put each work item on one row. Use C for its allocation, D for the latest written quote or estimate, and E for the cost basis. Filter column D for blanks even when a row is marked Confirmed. Keep payment status in a separate column if you also track cash paid.

Work through the eight synthetic rows

Budget rowWorkAllocation (USD)Latest cost (USD)Basis
2Cabinets10090Estimate
3Plumbing147143Confirmed
4Electrics194BlankConfirmed
5Flooring241249Estimate
6Painting288302Confirmed
7Appliances335355Confirmed
8Permits382408Estimate
9Waste removal429461Confirmed

Paste the amounts into Budget!C2:E9, leaving D4 empty. The confirmed rows with a price total $1,261. The estimates total $747. Together they leave $108 for the missing quote.

=SUM(C2:C9)-SUM(D2:D9)
=COUNT(D2:D9)
=SUMIF(E2:E9,"Confirmed",D2:D9)
=SUMIF(E2:E9,"Estimate",D2:D9)

The count is 7 out of 8. The seven known rows had $1,922 allocated and cost $2,008, an $86 overrun. If the electrical quote comes in at its $194 allocation, total planned cost becomes $2,202, or $86 over budget. Check that Budget!D4 contains a number before describing the total as complete. An entered zero needs the same support as any other quote.

Check the next quote against the remaining budget

Enter a numeric quote once it arrives and recalculate the known subtotal and its difference from the full budget. The table above uses independently checked synthetic records. If you try the same review in Jolene.pro, ask for the known cost, the missing prices and the cells behind the remaining budget.