Creative WorkEveryday Data

Where Is Your Recital Preparation Waiting Longest?

In Solo pieces, the median wait from Selected to Practiced is 2 days. From Practiced to Run through, it is 2.5 days. That is what the fictional set preparation sample shows when you look at the records behind the headline.

The set list is complete, but some pieces have not had a play-through.

What the records show

The first comparison uses 7 completed transitions in that group. The second uses 4. The counts differ because unfinished work can contribute to one transition and stay open in another. Treat a group’s typical completed wait and its oldest open age as separate scheduling indicators.

Group First transition count First median days Second transition count Second median days
Solo pieces 7 2 4 2.5
Ensemble pieces 7 3 4 4
Studies 7 3 4 4

Source in the sample: Work Log, rows 2–9 (columns C–E).

What to check next

If you work weekends differently, decide whether to compare calendar or business days before reusing the calculation. This example uses calendar days throughout. Check each piece’s last recorded stage before the rehearsal.

Try the same review in Jolene.pro using a workbook you already keep.

For each group, show the median calendar days and eligible sample size for Selected to Practiced and Practiced to Run through. Use completed transitions and flag open items separately.

See the workbook method and fictional source tables.

More spreadsheet examples for Musicians.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.