How to Check a Cumulative Claim Against the Certified Prior Revision in Excel
The subtraction can be right and still use the wrong starting point.
A construction practitioner’s Autodesk forum post, dated January 28, 2026, describes preparing cumulative claims in interconnected Excel worksheets while their receiving workflow expects current-period entries. That raises a separate spreadsheet question: which prior revision should you subtract?
This worked example uses invented contract, application and line IDs. It checks two proposed current-period entries against a supplied, independently confirmed certified baseline. It does not test Autodesk imports or determine what a contractor should be paid.
Download the certified prior claim workbook.
One line, two prior revisions
For contract C1, line S17 has two snapshots of prior application P04. Working revision R1 says $85,000 cumulative gross work completed. Certified revision R2 says $90,000. The current P05 claim says $125,000 cumulative, while a supplied draft current-period entry says $40,000.
The selected certified baseline supports $125,000 minus $90,000, or $35,000. Adding the draft’s $40,000 to that same certified base would produce $130,000 cumulative. That is $5,000 above the current claim.
| SOV line | Certified prior | Current cumulative | Expected current | Draft current | Draft variance |
|---|---|---|---|---|---|
| S17 | $90,000 | $125,000 | $35,000 | $40,000 | +$5,000 |
| S18 | $40,000 | $50,000 | $10,000 | $10,000 | $0 |
| Total | $130,000 | $175,000 | $45,000 | $50,000 | +$5,000 |
The $40,000 draft for S17 is consistent with subtracting the older $85,000 working figure. That arithmetic does not make the older figure the approved baseline.
Make the revision selection explicit
The Records sheet preserves the original snapshots at A13:H16 and current claim inputs at A21:H22. Controls D4:D10 name contract C1, prior application P04, certified revision R2, current application P05 and current claim revision R1. They also record confirmation that the measurement basis is comparable and the certified selection has been checked.
For S17, compare Records!A14:H14 with A21:H21. The older working row is A13:H13. For S18, compare A16:H16 with A22:H22. The raw status, measure and currency travel with each amount.
The confirmed revision is an input. The workbook does not guess it from the largest amount, the row order or a filename. Match contract, prior application, revision, SOV line, measure and currency together. A line number by itself is insufficient.
Autodesk’s cost payment documentation describes prior-application values and export/reimport workflows. Check the receiving system’s actual prior values and the project’s approval record separately. This sample cannot establish those facts.
Hold incomplete comparisons
A missing or duplicate prior link withholds the affected calculation and overall totals. Blank amounts remain unknown. Numeric zero remains a valid amount. Selecting a working revision triggers a prior-status review. Missing confirmations, different currency or a different measure also require review.
A negative current-minus-prior delta remains visible as a reversal for review. It is not silently replaced with zero. Positive draft variance means an overstatement against the selected base; negative variance means an understatement.
This file covers gross work completed in USD only. Retention, tax, stored materials, advance payments and advance recovery belong in their own documented checks. The result is not net cash payable. The sample ranges are fixed at four prior snapshots and two current lines; extend all affected ranges together for more records.
What we verified in Jolene
The workbook passed 18 local calculation states, including missing and duplicate links, blank versus zero amounts, different revisions, currency and measure changes, reversals and reordered rows. Both sheets were visually checked, and saved source values and outputs were inspected.
In the live public-file test, Jolene read the original workbook while excluding the Review results and derived keys. It independently returned $35,000 and $10,000 expected current work, the $45,000 total and the $5,000 draft overstatement. It cited the correct raw rows and selection controls. Its reported byte count and SHA-256 matched the saved file.
The separate native-upload test could not access its extracted database. The source appeared ready with zero tables, so that route remains awaiting a product test. The verified calculations and cell references above came from the public workbook route.
For a similar check in Jolene.pro, ask: “Use the confirmed certified prior revision. Compare the current cumulative claim with the proposed period entries by contract and SOV line. Show the source cells and hold ambiguous links.” Keep the original snapshots alongside the result.