How to Reconcile Jira Sprint Commitment and Completed Points in Excel

Jira shows 26 completed points against a commitment of 21. That can happen even when eight points from the original plan remain unfinished or were removed. The chart uses the estimate at two different moments. To see how much of the starting plan landed, keep the original estimates beside the closing status.

Start with Jira’s Velocity Chart

A Jira user asked whether issues added after sprint start appear on the chart. Atlassian documents that commitment uses the estimate at start and completed work uses the estimate at close, including scope changes. Check the same board, sprint and estimate statistic. This sample uses story points and a single Done status. Use the board’s completion definition when checking real data.

Keep start and close snapshots and the issue history. If you only have the current issue export, use timestamped changes to restore the two snapshots before calculating either total. A work item marked Done after the sprint ended belongs outside the close snapshot.

Reproduce the two calculations in Excel

Paste these synthetic CSV blocks at A1 into Sprint_Start and Sprint_Close. Split the columns at commas if needed. Each issue appears once per snapshot. The example sprint runs November 2–13, 2026.

Sprint_Start

Issue,Title,Start estimate,Status
SPR-11,Shipment export,5,To do
SPR-12,Stock dashboard,8,In progress
SPR-13,Warehouse filters,3,To do
SPR-14,CSV error message,5,To do

Sprint_Close

Issue,Title,Close estimate,Status at close
SPR-11,Shipment export,5,Done
SPR-12,Stock dashboard,13,Done
SPR-13,Warehouse filters,3,In progress
SPR-15,Return label layout,8,Done
SPR-16,Add warehouse field,2,To do

In Sprint_Start E2, enter the formula below and fill through E5 to retain the original estimate for items marked Done at close. Put =SUM(C2:C5) in C6 and =SUM(E2:E5) in E6. Put =E6/C6 in F6 and format it as a percentage.

=IF(COUNTIFS(Sprint_Close!$A$2:$A$6,A2,Sprint_Close!$D$2:$D$6,"Done")=1,C2,0)

In Sprint_Close E2:F2, enter these formulas for completed close points and scope membership. Fill down through row 6 and sum close estimate and completed close points separately.

=IF(D2="Done",C2,0)
=IF(COUNTIF(Sprint_Start!$A$2:$A$5,A2)=0,"Added","Original")

Explain the five points above commitment

The synthetic change log supplies the dates and estimates behind the two snapshots.

Event,Date,Issue,Change,Earlier points,Later points
EV-21,2026-11-03,SPR-14,Removed from sprint,5,
EV-22,2026-11-04,SPR-12,Estimate changed,8,13
EV-23,2026-11-05,SPR-15,Added to sprint,,8
EV-24,2026-11-06,SPR-16,Added to sprint,,2
EV-25,2026-11-07,SPR-17,Added to sprint,,1
EV-26,2026-11-08,SPR-17,Removed from sprint,1,
EV-27,2026-11-14,SPR-13,Marked Done after close,,

The opening scope was 21. The change log removes SPR-14 for five points, adds five points to SPR-12’s estimate and adds ten points across SPR-15 and SPR-16. SPR-17 was added and removed in the same sprint, so it nets to zero. That brings the closing scope to 31, of which 26 were completed and five were unfinished at close. SPR-13 was marked Done November 14, after the cutoff.

Of the original 21 points, 13 were completed at the original estimates: five for SPR-11 and eight for SPR-12. That is 61.9%. The completed bar reaches 26 by adding SPR-12’s five re-estimated points and SPR-15’s eight added points to those 13. Track this across sprints to understand scope changes and close timing.

Trace the difference to the issue history

In Jolene.pro, open an Excel workbook with the two snapshots and the change log. Ask which issues account for the difference between committed and completed points and request the cells behind each change. Include the close cutoff and ask for the original-plan result at starting estimates. Save the check for the next sprint export.