Industry Use Cases

How to Compare Solar Site Generation With the Monthly Forecast

A site missed its monthly generation forecast. The monthly total cannot tell you whether the gap came from three poor days or a smaller loss every afternoon.

What to pull

Use Excel forecasts and meter readings, or export daily generation from monitoring and the dated forecast from the asset model. Bring downtime and weather records where available.

How to check it

Align meter boundary, time zone, interval and units. Separate missing telemetry from zero generation. Compare daily actuals with the corresponding forecast and use operating logs to investigate the gap.

Which days account for the generation shortfall? Show the difference, missing intervals, relevant event records and source rows.

What to do with the result

Start with the days responsible for most of the gap. Ask site staff to review the event records before attributing the shortfall.

Treat the comparison as a screening tool and verify meter completeness.

Try Jolene.pro ยท Follow Jolene.pro on LinkedIn

Leave a comment