How to Check Grain Moisture Deductions by Load
Two corn loads with similar moisture land different deductions. The posted schedule may have changed, or one settlement may be using a different test.
What to pull
Use Excel quality tests, scale tickets, discount schedules and settlement detail. If those live in software, export the test register and ticket-level settlement data. Keep test timestamps, crop and effective dates.
How to check it
Match the accepted test to the ticket and apply the schedule in force for that crop and delivery. Show physical shrink and dollar discounts separately. Flag missing or conflicting tests.
Which moisture deductions differ from the applicable schedule? Show the accepted test, expected deduction, booked deduction and source rows.
What to do with the result
If a settlement used a superseded test, pull the signed correction and verify which test governs. Start with the largest unexplained differences before contacting growers.
Use the approved schedule, rounding rules and final accepted test.