Check available stock for cut stock (Woodworkers)
A long offcut is listed beside a second spreadsheet with the same bench stock.
Category
A long offcut is listed beside a second spreadsheet with the same bench stock.
Use measured yardage, dye lots and notes on project state to plan what to start and finish.
In Hats, the median wait from Started to Worked is 4 days. From Worked to Finished, it is 4 days.
11 of 24 records are open on October 1, 2026. WORK-001 has waited 27 calendar days since its last logged stage.
Several pieces only need ends woven in and another needs a whole second mitten.
The largest confirmed shortfall is 8 on P-018 in Mittens.
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
A long cuff adds yarn, while a second pair of mittens never got weighed or measured.
Natural lot A has 40 in “Reserved yarn.” The shortage would change from 50 to 10 if those quantities became usable.
Natural lot A has 100 available against 150 committed. The shortfall is 50.