How Many Event Sign-Ups Turned Into Attendance?
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
Category
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
There were enough names on the sheet, but most were signed up for check-in.
Reconcile equipment requests, availability and return records for shared tools.
In Hand tools, the median wait from Requested to Checked out is 4 days. From Checked out to Returned, it is 4 days.
11 of 24 records are open on October 1, 2026. WORK-001 has waited 27 calendar days since its last logged stage.
Half the replies arrived, but a return needs its own check-in record.
The largest confirmed shortfall is 8 on P-018 in Drop-in tools.
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero.
The booked calendar is full, but actual checkouts were recorded for fewer slots.
Hand tools has 4 in “Checked-out tools.” The shortage would change from 5 to 1 if those quantities became usable.