Which completed fleet repairs still lack a sign-off record?
At the fictional November 27 handover, D1 has both records, D2 lacks acceptance evidence, D3 has no completed repair recorded and D4 has acceptance after the cutoff.
This example uses synthetic records and was independently checked. A live Jolene.pro result for these exact rows remains unverified.
Copy the example records
Copy each table to its named worksheet with row 1 as headers. Keep the original records alongside the comparison.
Defects!A1:B5
| Vehicle | Defect |
|---|---|
| V1 | D1 |
| V2 | D2 |
| V2 | D3 |
| V3 | D4 |
Repairs!A1:C4
| Vehicle | Defect | Completed |
|---|---|---|
| V1 | D1 | 2026-11-25 |
| V2 | D2 | 2026-11-25 |
| V3 | D4 | 2026-11-25 |
Acceptance!A1:C3
| Vehicle | Defect | Accepted |
|---|---|---|
| V1 | D1 | 2026-11-26 |
| V3 | D4 | 2026-11-28 |
Run the records check
Match vehicle plus defect ID with dated completion and authorized acceptance records under the supplied rule. Cite Repairs!A3:C4 and Acceptance!A3:C3 to distinguish a missing record from a late one. Hold conflicting evidence for review. The guide documents evidence coverage only.
Use the organization's supplied acceptance requirement and keep the acceptance authority and timestamp in the underlying records. Check completion and acceptance against the same cutoff. In this date-only example, include records through November 27. Defect D3 lacks a completed repair row, while D4 has one and its acceptance falls after the cutoff.
Review exceptions before closing
A commenter asks how repairs and sign-off are evidenced. The example matches these records as of a handover, without making a safety determination. Public fleet handover post and discussion.
Retain the reporting period, match keys, missing records and source row references with the result. Repeat the check after confirming corrections in the original system.