Audit warehouse assignments against the regional list that was in force
A linked dropdown can narrow the choices at entry time. An export assembled from old rows or a revised regional list still needs a date-aware check. A warehouse added to a region in December cannot validate a November assignment by itself.
Records to pull
- Assignment export
- Region-to-warehouse rules with effective dates
- Business date or batch cutoff
Run the check
For each assignment, find rules for its region that cover the business date. Use inclusive effective start and an exclusive end, or document your own boundary convention consistently. If there is no rule for that region and date, report missing rule coverage. If the region is covered but the warehouse is absent from its active allowed list, flag the assignment. Investigate conflicting rule versions before treating the list as complete.
Work through a synthetic example
| Assignment | Rule evidence | Decision |
|---|---|---|
| Assignments row 2 · Nov 20 · North / N1 | Rules row 2 · North / N1 active in November | Valid |
| Assignments row 3 · Nov 20 · North / S1 | Rules row 3 · North / S1 starts Dec 1 | Outside November allowed list |
| Assignments row 4 · Nov 20 · West / W1 | No West rule covers Nov 20 | Rule coverage unknown |
Keep both the assignment ID and rule row in the result. That gives the reviewer a way to distinguish a warehouse assignment to correct from a regional list that needs to be supplied.
Further reading. Smartsheet linked dropdown filters.