The tanks have different gaps in the notebook even though the summary draws a line for each day.
About this example. This is an example of organizing care or activity records. It does not provide veterinary care or animal behavior advice. Check the animal’s care instructions and consult a veterinarian or qualified trainer when appropriate.
Prepare the records
Keep the reading calendar on a schedule sheet with one ID per planned check. The log stores what was recorded. Use both sheets to calculate coverage against planned dates.
- Schedule uses
Check ID,Group,Scheduled date. The example has 36 data rows. - Log uses
Check ID,Log date,Status,Nitrate mg/L. The example has 30 data rows.
The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.
Check the workbook
- Check uniqueness and pair Schedule and Log by Check ID. Sort within each group by scheduled date.
- Separate absent log IDs, explicitly skipped checks, blank measured values and measured zeros.
- Count usable numeric records and report coverage. If using a time chart, keep a gap where the measurement is missing.
Ask Jolene.pro
Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.
Match the reading calendar to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
For a second pass:
Find skipped checks, recorded rows with blank nitrate mg/l and measured zeros. Give their IDs and dates. Keep the separate list of scheduled checks that have no log row.
Confirm the result
Display tank has a run of three missing entries from 2026-09-11 to 2026-09-15. The log separates 1 explicitly skipped check, 1 row with a blank value and 1 recorded zero. Start with Schedule, rows 7–9 and Log, rows 6, 13, 30. The separate answer key gives the expected details for both questions.
View the fictional source tables
Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.
Schedule
| Excel row | Check ID | Group | Scheduled date |
|---|---|---|---|
| 2 | CHECK-001 | Display tank | 2026-09-01 |
| 3 | CHECK-002 | Display tank | 2026-09-03 |
| 4 | CHECK-003 | Display tank | 2026-09-05 |
| 5 | CHECK-004 | Display tank | 2026-09-07 |
| 6 | CHECK-005 | Display tank | 2026-09-09 |
| 7 | CHECK-006 | Display tank | 2026-09-11 |
| 8 | CHECK-007 | Display tank | 2026-09-13 |
| 9 | CHECK-008 | Display tank | 2026-09-15 |
| 10 | CHECK-009 | Display tank | 2026-09-17 |
| 11 | CHECK-010 | Display tank | 2026-09-19 |
| 12 | CHECK-011 | Display tank | 2026-09-21 |
| 13 | CHECK-012 | Display tank | 2026-09-23 |
| 14 | CHECK-013 | Shrimp tank | 2026-09-01 |
| 15 | CHECK-014 | Shrimp tank | 2026-09-03 |
| 16 | CHECK-015 | Shrimp tank | 2026-09-05 |
| 17 | CHECK-016 | Shrimp tank | 2026-09-07 |
| 18 | CHECK-017 | Shrimp tank | 2026-09-09 |
| 19 | CHECK-018 | Shrimp tank | 2026-09-11 |
| 20 | CHECK-019 | Shrimp tank | 2026-09-13 |
| 21 | CHECK-020 | Shrimp tank | 2026-09-15 |
| 22 | CHECK-021 | Shrimp tank | 2026-09-17 |
| 23 | CHECK-022 | Shrimp tank | 2026-09-19 |
| 24 | CHECK-023 | Shrimp tank | 2026-09-21 |
| 25 | CHECK-024 | Shrimp tank | 2026-09-23 |
| 26 | CHECK-025 | Grow-out tank | 2026-09-01 |
| 27 | CHECK-026 | Grow-out tank | 2026-09-03 |
| 28 | CHECK-027 | Grow-out tank | 2026-09-05 |
| 29 | CHECK-028 | Grow-out tank | 2026-09-07 |
| 30 | CHECK-029 | Grow-out tank | 2026-09-09 |
| 31 | CHECK-030 | Grow-out tank | 2026-09-11 |
| 32 | CHECK-031 | Grow-out tank | 2026-09-13 |
| 33 | CHECK-032 | Grow-out tank | 2026-09-15 |
| 34 | CHECK-033 | Grow-out tank | 2026-09-17 |
| 35 | CHECK-034 | Grow-out tank | 2026-09-19 |
| 36 | CHECK-035 | Grow-out tank | 2026-09-21 |
| 37 | CHECK-036 | Grow-out tank | 2026-09-23 |
Log
| Excel row | Check ID | Log date | Status | Nitrate mg/L |
|---|---|---|---|---|
| 2 | CHECK-001 | 2026-09-01 | Recorded | 9 |
| 3 | CHECK-002 | 2026-09-03 | Recorded | 16 |
| 4 | CHECK-003 | 2026-09-05 | Recorded | 9 |
| 5 | CHECK-004 | 2026-09-07 | Recorded | 16 |
| 6 | CHECK-005 | 2026-09-09 | Skipped | |
| 7 | CHECK-009 | 2026-09-17 | Recorded | 9 |
| 8 | CHECK-010 | 2026-09-19 | Recorded | 16 |
| 9 | CHECK-011 | 2026-09-21 | Recorded | 9 |
| 10 | CHECK-012 | 2026-09-23 | Recorded | 16 |
| 11 | CHECK-013 | 2026-09-01 | Recorded | 9 |
| 12 | CHECK-014 | 2026-09-03 | Recorded | 16 |
| 13 | CHECK-015 | 2026-09-05 | Recorded, value blank | |
| 14 | CHECK-016 | 2026-09-07 | Recorded | 16 |
| 15 | CHECK-017 | 2026-09-09 | Recorded | 9 |
| 16 | CHECK-018 | 2026-09-11 | Recorded | 16 |
| 17 | CHECK-019 | 2026-09-13 | Recorded | 9 |
| 18 | CHECK-021 | 2026-09-17 | Recorded | 9 |
| 19 | CHECK-023 | 2026-09-21 | Recorded | 9 |
| 20 | CHECK-024 | 2026-09-23 | Recorded | 16 |
| 21 | CHECK-025 | 2026-09-01 | Recorded | 9 |
| 22 | CHECK-026 | 2026-09-03 | Recorded | 16 |
| 23 | CHECK-027 | 2026-09-05 | Recorded | 9 |
| 24 | CHECK-028 | 2026-09-07 | Recorded | 16 |
| 25 | CHECK-029 | 2026-09-09 | Recorded | 9 |
| 26 | CHECK-030 | 2026-09-11 | Recorded | 16 |
| 27 | CHECK-031 | 2026-09-13 | Recorded | 9 |
| 28 | CHECK-032 | 2026-09-15 | Recorded | 16 |
| 29 | CHECK-034 | 2026-09-19 | Recorded | 16 |
| 30 | CHECK-035 | 2026-09-21 | Recorded | 0 |
| 31 | CHECK-036 | 2026-09-23 | Recorded | 16 |
More spreadsheet examples for Aquarium keepers.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.