Everyday DataHelp ArticlesHome & Garden

Calculate rates from paired records for work sessions (Bonsai enthusiasts)

A full Saturday at one bench can mean lots of trees or one tree that needed extra work.

Prepare the records

Each row carries a group, the measured amount (bench time min) and its matching basis (trees worked on). Keep the raw numbers in consistent units. The comparison in this example is scoped to “Pruning and cleanup.”

  • Log uses Record ID, Group, Date, Scope, Bench time min, Trees worked on. The example has 19 data rows.

The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.

Check the workbook

  1. Check that the numerator and denominator belong to the same record and match the period and group you want to compare.
  2. For a group rate, sum the numerator and denominator on the same eligible rows and divide once. Require a positive recorded denominator.
  3. List excluded IDs, show how many rows support each ratio, and keep standalone totals labeled by their coverage.

Ask Jolene.pro

Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.

For “Pruning and cleanup,” sum bench time min and trees worked on on the same eligible rows. Show both and their ratio (min/tree) by group. Exclude blanks and nonpositive denominators and list the excluded IDs.

For a second pass:

Which records have only one of the two required values? Count complete pairs and separately total every nonblank bench time min and the subset that also has a valid denominator. Cite the excluded rows.

Confirm the result

Maple records the most bench time min on complete rows. Elm has the highest min/tree figure. LOG-012 has a basis but no measured amount. LOG-016 has a measured amount but no basis. Start with Log, rows 2–12, 14–16, 18–20 (columns E and F) and Log, rows 13, 17 (columns E and F). The separate answer key gives the expected details for both questions.

View the fictional source tables

Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.

Log

Excel row Record ID Group Date Scope Bench time min Trees worked on
2 LOG-001 Maple 2026-09-02 Pruning and cleanup 146.76 8
3 LOG-002 Maple 2026-09-05 Pruning and cleanup 213.7 10
4 LOG-003 Maple 2026-09-08 Pruning and cleanup 246.76 12
5 LOG-004 Maple 2026-09-11 Pruning and cleanup 270.95 14
6 LOG-005 Maple 2026-09-14 Pruning and cleanup 146.76 8
7 LOG-006 Maple 2026-09-17 Pruning and cleanup 213.7 10
8 LOG-007 Maple 2026-09-20 Pruning and cleanup 246.76 12
9 LOG-008 Maple 2026-09-23 Pruning and cleanup 270.95 14
10 LOG-009 Juniper 2026-09-03 Pruning and cleanup 141.52 6
11 LOG-010 Juniper 2026-09-06 Pruning and cleanup 219.8 8
12 LOG-011 Juniper 2026-09-09 Pruning and cleanup 264.38 10
13 LOG-012 Juniper 2026-09-12 Pruning and cleanup 12
14 LOG-013 Juniper 2026-09-15 Pruning and cleanup 141.52 6
15 LOG-014 Juniper 2026-09-18 Pruning and cleanup 219.8 8
16 LOG-015 Elm 2026-09-04 Pruning and cleanup 106.58 4
17 LOG-016 Elm 2026-09-07 Pruning and cleanup 186.22
18 LOG-017 Elm 2026-09-10 Pruning and cleanup 238.92 8
19 LOG-018 Elm 2026-09-13 Pruning and cleanup 281.09 10
20 LOG-019 Elm 2026-09-16 Pruning and cleanup 106.58 4

More spreadsheet examples for Bonsai enthusiasts.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.