Everyday DataHome & Garden

Where Does Your Repotting Queue Spend the Most Time?

In Small pots, the median wait from Checked to Prepared is 4 days. From Prepared to Repotted, it is 4 days. That is what the fictional repotting projects sample shows when you look at the records behind the headline.

Several pots are ready but the labels and materials are still in a different room.

What the records show

The first comparison uses 7 completed transitions in that group. The second uses 4. The counts differ because unfinished work can contribute to one transition and stay open in another. Treat a group’s typical completed wait and its oldest open age as separate scheduling indicators.

Group First transition count First median days Second transition count Second median days
Small pots 7 4 4 4
Medium pots 7 3 4 3.5
Large pots 7 3 5 2

Source in the sample: Work Log, rows 2–9 (columns C–E).

What to check next

If you work weekends differently, decide whether to compare calendar or business days before reusing the calculation. This example uses calendar days throughout. Use the open stage list to choose the next weekend jobs.

Try the same review in Jolene.pro using a workbook you already keep.

For each group, show the median calendar days and eligible sample size for Checked to Prepared and Prepared to Repotted. Use completed transitions and flag open items separately.

See the workbook method and fictional source tables.

More spreadsheet examples for Houseplant collectors.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.