Everyday DataHelp ArticlesHome & Garden

Match plan to actual records for planting entries (Vegetable gardeners)

An extra row of beans can hide a few missing squash plants in the plot total.

Prepare the records

Put one row per ID on Plan and one per ID on Recorded. The example uses September dates for planting entries. Use the same units on both sheets. This check works even when one sheet has records the other never received.

  • Plan uses Record ID, Group, Date, Planned plant count. The example has 24 data rows.
  • Recorded uses Record ID, Group, Date, Recorded plant count. The example has 24 data rows.

The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.

Check the workbook

  1. Check that Record ID is unique in each sheet. Pair records by ID, using the group and date as a check on the match.
  2. Keep missing ID, present but blank, measured zero, and recorded-only IDs in separate lists.
  3. Calculate recorded minus plan on pairs with numbers on both sides. Show the shortfall sum separately from the signed net.

Ask Jolene.pro

Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.

Compare the planting plan and bed census. Which planned IDs have no recorded match? Show records with a blank value, actual zeros and recorded-only IDs separately. Cite the source rows.

For a second pass:

For pairs with a numeric value on both sheets, show planned and recorded plant count by group, signed net and shortfall-only sum. Identify the largest confirmed shortfall and cite both cells.

Confirm the result

24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero. The largest confirmed shortfall is 7 on P-018 in Squash. Start with Plan, rows 4, 13, 22; Recorded, rows 7, 19 and Plan, row 19; Recorded, row 19. The separate answer key gives the expected details for both questions.

View the fictional source tables

Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.

Plan

Excel row Record ID Group Date Planned plant count
2 P-001 Tomatoes 2026-09-02 3
3 P-002 Tomatoes 2026-09-05 5
4 P-003 Tomatoes 2026-09-08 7
5 P-004 Tomatoes 2026-09-11 9
6 P-005 Tomatoes 2026-09-14 3
7 P-006 Tomatoes 2026-09-17 5
8 P-007 Tomatoes 2026-09-20 7
9 P-008 Tomatoes 2026-09-23 9
10 P-009 Beans 2026-09-03 4
11 P-010 Beans 2026-09-06 6
12 P-011 Beans 2026-09-09 8
13 P-012 Beans 2026-09-12 10
14 P-013 Beans 2026-09-15 4
15 P-014 Beans 2026-09-18 6
16 P-015 Beans 2026-09-21 8
17 P-016 Beans 2026-09-24 10
18 P-017 Squash 2026-09-04 5
19 P-018 Squash 2026-09-07 7
20 P-019 Squash 2026-09-10 9
21 P-020 Squash 2026-09-13 3
22 P-021 Squash 2026-09-16 5
23 P-022 Squash 2026-09-19 7
24 P-023 Squash 2026-09-22 9
25 P-024 Squash 2026-09-25 3

Recorded

Excel row Record ID Group Date Recorded plant count
2 P-001 Tomatoes 2026-09-02 3
3 P-002 Tomatoes 2026-09-05 4
4 P-004 Tomatoes 2026-09-11 11
5 P-005 Tomatoes 2026-09-14 1
6 P-006 Tomatoes 2026-09-17 6
7 P-007 Tomatoes 2026-09-20
8 P-008 Tomatoes 2026-09-23 12
9 X-001 Tomatoes 2026-09-26 4
10 P-009 Beans 2026-09-03 4
11 P-010 Beans 2026-09-06 5
12 P-011 Beans 2026-09-09 8
13 P-013 Beans 2026-09-15 2
14 P-014 Beans 2026-09-18 7
15 P-015 Beans 2026-09-21 8
16 P-016 Beans 2026-09-24 13
17 X-002 Beans 2026-09-27 5
18 P-017 Squash 2026-09-04 5
19 P-018 Squash 2026-09-07 0
20 P-019 Squash 2026-09-10 9
21 P-020 Squash 2026-09-13 5
22 P-022 Squash 2026-09-19 8
23 P-023 Squash 2026-09-22 9
24 P-024 Squash 2026-09-25 7
25 X-003 Squash 2026-09-28 6

More spreadsheet examples for Vegetable gardeners.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.