Check dates for missing records for temperature inspections (Homebrewers using Brewfather)
A flat chart can bridge a missing reading when the export skips several checks.
About this example. The example reviews weights, dates and inventory. The figures do not establish that food or a drink is safe to prepare, store or serve. Follow applicable food safety guidance and check labels and storage conditions directly.
Prepare the records
Keep the fermentation readings on a schedule sheet with one ID per planned check. The log stores what was recorded. Use both sheets to calculate coverage against planned dates.
- Schedule uses
Check ID,Group,Scheduled date. The example has 36 data rows. - Log uses
Check ID,Log date,Status,Temperature Celsius. The example has 30 data rows.
The sample uses fictional rows and prepared columns. If you start with a platform export, consult Brewfather fermentation log exports and map the available columns before using this example.
Check the workbook
- Check uniqueness and pair Schedule and Log by Check ID. Sort within each group by scheduled date.
- Separate absent log IDs, explicitly skipped checks, blank measured values and measured zeros.
- Count usable numeric records and report coverage. If using a time chart, keep a gap where the measurement is missing.
Ask Jolene.pro
Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.
Match the fermentation readings to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
For a second pass:
Find skipped checks, recorded rows with blank temperature celsius and measured zeros. Give their IDs and dates. Keep the separate list of scheduled checks that have no log row.
Confirm the result
Pale ale has a run of three missing entries from 2026-09-06 to 2026-09-08. The log separates 1 explicitly skipped check, 1 row with a blank value and 0 recorded zeros. Start with Schedule, rows 7–9 and Log, rows 6, 13. The separate answer key gives the expected details for both questions.
View the fictional source tables
Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.
Schedule
| Excel row | Check ID | Group | Scheduled date |
|---|---|---|---|
| 2 | CHECK-001 | Pale ale | 2026-09-01 |
| 3 | CHECK-002 | Pale ale | 2026-09-02 |
| 4 | CHECK-003 | Pale ale | 2026-09-03 |
| 5 | CHECK-004 | Pale ale | 2026-09-04 |
| 6 | CHECK-005 | Pale ale | 2026-09-05 |
| 7 | CHECK-006 | Pale ale | 2026-09-06 |
| 8 | CHECK-007 | Pale ale | 2026-09-07 |
| 9 | CHECK-008 | Pale ale | 2026-09-08 |
| 10 | CHECK-009 | Pale ale | 2026-09-09 |
| 11 | CHECK-010 | Pale ale | 2026-09-10 |
| 12 | CHECK-011 | Pale ale | 2026-09-11 |
| 13 | CHECK-012 | Pale ale | 2026-09-12 |
| 14 | CHECK-013 | Porter | 2026-09-01 |
| 15 | CHECK-014 | Porter | 2026-09-02 |
| 16 | CHECK-015 | Porter | 2026-09-03 |
| 17 | CHECK-016 | Porter | 2026-09-04 |
| 18 | CHECK-017 | Porter | 2026-09-05 |
| 19 | CHECK-018 | Porter | 2026-09-06 |
| 20 | CHECK-019 | Porter | 2026-09-07 |
| 21 | CHECK-020 | Porter | 2026-09-08 |
| 22 | CHECK-021 | Porter | 2026-09-09 |
| 23 | CHECK-022 | Porter | 2026-09-10 |
| 24 | CHECK-023 | Porter | 2026-09-11 |
| 25 | CHECK-024 | Porter | 2026-09-12 |
| 26 | CHECK-025 | Wheat beer | 2026-09-01 |
| 27 | CHECK-026 | Wheat beer | 2026-09-02 |
| 28 | CHECK-027 | Wheat beer | 2026-09-03 |
| 29 | CHECK-028 | Wheat beer | 2026-09-04 |
| 30 | CHECK-029 | Wheat beer | 2026-09-05 |
| 31 | CHECK-030 | Wheat beer | 2026-09-06 |
| 32 | CHECK-031 | Wheat beer | 2026-09-07 |
| 33 | CHECK-032 | Wheat beer | 2026-09-08 |
| 34 | CHECK-033 | Wheat beer | 2026-09-09 |
| 35 | CHECK-034 | Wheat beer | 2026-09-10 |
| 36 | CHECK-035 | Wheat beer | 2026-09-11 |
| 37 | CHECK-036 | Wheat beer | 2026-09-12 |
Log
| Excel row | Check ID | Log date | Status | Temperature Celsius |
|---|---|---|---|---|
| 2 | CHECK-001 | 2026-09-01 | Recorded | 17.6 |
| 3 | CHECK-002 | 2026-09-02 | Recorded | 18 |
| 4 | CHECK-003 | 2026-09-03 | Recorded | 18.4 |
| 5 | CHECK-004 | 2026-09-04 | Recorded | 18.8 |
| 6 | CHECK-005 | 2026-09-05 | Skipped | |
| 7 | CHECK-009 | 2026-09-09 | Recorded | 18.4 |
| 8 | CHECK-010 | 2026-09-10 | Recorded | 18.8 |
| 9 | CHECK-011 | 2026-09-11 | Recorded | 19.2 |
| 10 | CHECK-012 | 2026-09-12 | Recorded | 19.6 |
| 11 | CHECK-013 | 2026-09-01 | Recorded | 18.6 |
| 12 | CHECK-014 | 2026-09-02 | Recorded | 19 |
| 13 | CHECK-015 | 2026-09-03 | Recorded, value blank | |
| 14 | CHECK-016 | 2026-09-04 | Recorded | 19.8 |
| 15 | CHECK-017 | 2026-09-05 | Recorded | 20.2 |
| 16 | CHECK-018 | 2026-09-06 | Recorded | 20.6 |
| 17 | CHECK-019 | 2026-09-07 | Recorded | 18.6 |
| 18 | CHECK-021 | 2026-09-09 | Recorded | 19.4 |
| 19 | CHECK-023 | 2026-09-11 | Recorded | 20.2 |
| 20 | CHECK-024 | 2026-09-12 | Recorded | 20.6 |
| 21 | CHECK-025 | 2026-09-01 | Recorded | 19.6 |
| 22 | CHECK-026 | 2026-09-02 | Recorded | 20 |
| 23 | CHECK-027 | 2026-09-03 | Recorded | 20.4 |
| 24 | CHECK-028 | 2026-09-04 | Recorded | 20.8 |
| 25 | CHECK-029 | 2026-09-05 | Recorded | 21.2 |
| 26 | CHECK-030 | 2026-09-06 | Recorded | 21.6 |
| 27 | CHECK-031 | 2026-09-07 | Recorded | 19.6 |
| 28 | CHECK-032 | 2026-09-08 | Recorded | 20 |
| 29 | CHECK-034 | 2026-09-10 | Recorded | 20.8 |
| 30 | CHECK-035 | 2026-09-11 | Recorded | 21.2 |
| 31 | CHECK-036 | 2026-09-12 | Recorded | 21.6 |
More spreadsheet examples for Homebrewers using Brewfather.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.