How to Find Grain Contracts at Risk of Missing Delivery

The delivery calendar looks full. One contract is still short because two loads on that calendar belong to a different buyer.

What to pull

Bring Excel contract, shipment and dispatch tabs, or export open contracts from grain accounting, applied deliveries and truck bookings. Keep contract ID, grade, quantity, window, load status and confirmed capacity.

How to check it

Deduct accepted deliveries from contract quantity. Compare remaining commitments with confirmed bookings within the delivery window. Separate provisional bookings and loads awaiting grade acceptance.

Which contracts have uncovered quantity due in the next seven days? Show accepted volume, confirmed bookings and source rows.

What to do with the result

If 180 tons are open and only 120 tons are confirmed inside the window, bring the 60-ton gap to dispatch before the remaining slots fill.

Sample figures. Confirm tolerances and amendments with the contract owner.