Industry Use Cases

The Next Delivery Is Friday. Will the Stock Last Until Then?

The purchase order says Friday. The stock report says 120 units. Neither tells the purchasing team whether the warehouse can cover demand until the delivery becomes usable. That answer needs quantities, timing and a clear view of what the stock is already expected to cover.

Inventory analysts and wholesale purchasing teams can use Jolene.pro to examine those records across Excel or CSV tables, request a coverage analysis and inspect the supporting rows. Save the investigation once it works, then reuse it when the next stock and purchase-order exports arrive.

Bring the records behind availability

Start with a dated stock export containing SKU, warehouse, unit of measure, on-hand quantity and any quality holds or unavailable stock. Include reservations separately. Add demand history by date and location, plus open purchase-order lines with outstanding quantity, expected receipt date and status.

Match products by stable SKU and warehouse identifiers. Convert cartons, cases and individual units using the appropriate pack sizes. Keep partially received orders at their outstanding quantity. A purchase order originally raised for 500 units does not provide another 500 if 400 have already arrived.

This is an established planning question. Odoo’s inventory documentation describes on-hand, incoming and outgoing quantities, together with receipt and delivery dates, and shows how a receipt arriving after demand creates a shortage. Jolene.pro’s role here is to analyze the exported workbook you supply.

State the demand assumption before calculating coverage

For a simple historical-demand baseline, calculate average daily demand over a stated window using the relevant operating calendar. Start with usable physical stock before subtracting reservations, because this baseline represents total demand. Show reserved quantities alongside the result so the team can see existing commitments.

For a commitment-aware projection, use dated open customer orders and count each commitment once. If the starting balance already excludes reserved stock, do not deduct those same reservations again. Add any forecast demand only after stating how it excludes demand already represented by orders.

Consider a hypothetical SKU with 120 usable units and average demand of 30 units per operating day. It has four operating days of coverage. If six operating days of demand must be served before replenishment becomes usable, the baseline requirement is 180 units, leaving a potential gap of 60. This assumes steady demand and no other movements.

Ask for a dated exception list

Upload the related tables and ask Jolene.pro:

“Compare stock coverage with confirmed incoming receipts by SKU and warehouse at this cutoff. Use the stated demand window and operating calendar. Show usable stock, reservations, demand assumptions, outstanding receipt quantities and dates, and potential gaps before replenishment. Do not count committed demand twice. Cite the source records and list missing inputs separately.”

Request a daily projected balance where the data supports one. The first receipt may be too small to cover the following days, so check successive receipts rather than stopping at the earliest date. Include receiving or inspection time if the goods cannot be used immediately on arrival.

Keep zero-demand SKUs, overdue purchase orders, missing receipt dates and incomplete demand history visible. Stockouts can suppress recorded sales, making historical sales a poor measure of unconstrained demand. Promotions and seasonal changes also deserve explicit assumptions. A coverage calculation is a planning scenario, not a promise about future orders.

Keep the analysis when the workbook changes

Save the analysis after reviewing its calculations and source references. The next export might add a supplier column, reorder fields or rename the stock sheet. Jolene.pro supports reusing saved analyses across supported structural changes, including sheet or column renames. Re-run it with the updated files and inspect any structure-change warnings.

Check that units and definitions remain comparable. “On Hand” changing to “Available” may mean reservations have already been deducted. That is a change in meaning to resolve before accepting the next result.

Bring the exception list to purchasing: which items may run short, when, by how much and which receipts the calculation relies on. The team can confirm dates and consider expediting, transfers or revised commitments. Try one warehouse and a short planning horizon first. Friday is a delivery date. The useful question is what happens before it.

Workflow reference: Odoo: Forecasted report.