Which Pottery Forms Took More Bench Time per Finished Piece?
A batch of bowls looks like the longest job until you count the pieces it produced.
About this example. This example reviews records. For equipment setup, maintenance or operation, follow the manufacturer’s instructions and your workshop’s safety procedures. Verify measurements and stock before cutting, building or running a machine.
The workbook uses fictional records. Mugs records the most bench time min on complete rows. Vases has the highest min/piece figure.
What the records show
Mugs has 805 across a basis of 88, which gives 9.15 min/piece. Vases has 336.04 across 26, or 12.92 min/piece. Each rate uses the corresponding totals. An average of row rates gives a small row the same weight as a large one and answers a different question.
| Group | Bench time min | Finished pieces | min/piece | Eligible records |
|---|---|---|---|---|
| Mugs | 805 | 88 | 9.15 | 8 |
| Bowls | 452.38 | 38 | 11.9 | 5 |
| Vases | 336.04 | 26 | 12.92 | 4 |
Source in the sample: Log, rows 2–12, 14–16, 18–20 (columns E and F).
What to check next
Keep the total if you need workload or volume. Use the rate when the question is what happened per unit of the same underlying activity. Use measured time per finished piece when booking bench time.
Try the same review in Jolene.pro using a workbook you already keep.
For “Same studio week,” sum bench time min and finished pieces on the same eligible rows. Show both and their ratio (min/piece) by group. Exclude blanks and nonpositive denominators and list the excluded IDs.
See the workbook method and fictional source tables.
More spreadsheet examples for Potters.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.
Try Jolene.pro with a workbook you already use.