Everyday DataMaking & Craft

Which Quilt Units Can You Finish Before the Sewing Meetup?

Stacked pieces hide which step was completed before you put them away.

The workbook uses fictional records. 11 of 24 records are open on October 1, 2026. WORK-001 has waited 28 calendar days since its last logged stage.

What the records show

The job is in Center blocks and last reached “Pieced” on 2026-09-03. A reader can check the last date before deciding what needs attention. Use the stage breakdown to tell the difference between work that has not moved past the first step and work that has one last recorded step remaining.

Group Total At Cut At Pieced At Pressed
Center blocks 8 1 3 4
Borders 8 1 3 4
Backing sections 8 1 2 5

Source in the sample: Work Log, row 2 (columns C–E).

What to check next

The open count tracks dates in this file. If a stage happened but was not entered, update its record before following up on a job. Start with units needing the shortest remaining step.

Try the same review in Jolene.pro using a workbook you already keep.

As of October 1, 2026, count units by the last stage recorded. List open IDs and calendar days since each last stage. Show the oldest and cite its source row.

See the workbook method and fictional source tables.

More spreadsheet examples for Quilters.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.