Everyday DataMaking & Craft

Which Projects Have No Actual Fabric Usage Recorded?

The largest confirmed shortfall is 35 on P-018 in Totes. That is what the fictional fabric estimates sample shows when you look at the records behind the headline.

Stripe matching ate more material while another project had no cutting note at all.

What the records show

A signed net lets an overage offset a shortfall. The shortfall column adds only the amounts below plan on matched IDs. Both use the same 20 pairs with a recorded number. P-018 needed 35 and recorded 0. Pull that record before making changes based on the group total.

Group Matched with values Plan Recorded Net Shortfalls
Aprons 6 170 185 15 15
Shirts 7 230 235 5 15
Totes 7 215 215 0 35

Source in the sample: Plan, row 19; Recorded, row 19.

What to check next

If the extra quantity can move between records, the net may matter. If it belongs to a distinct person, order or item, check individual shortfalls before treating an overage as coverage. Use measured differences to revise material estimates.

Try the same review in Jolene.pro using a workbook you already keep.

For pairs with a numeric value on both sheets, show planned and recorded fabric used cm by group, signed net and shortfall-only sum. Identify the largest confirmed shortfall and cite both cells.

See the workbook method and fictional source tables.

More spreadsheet examples for Sewists.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.