Everyday DataMaking & Craft

Which Leatherwork Stage Holds Up the Most Jobs?

In Wallets, the median wait from Cut to Assembled is 4 days. From Assembled to Finished, it is 4 days. That is what the fictional leather jobs sample shows when you look at the records behind the headline.

About this example. This example reviews records. For equipment setup, maintenance or operation, follow the manufacturer’s instructions and your workshop’s safety procedures. Verify measurements and stock before cutting, building or running a machine.

You have an evening to work and a bench full of parts at different stages.

What the records show

The first comparison uses 7 completed transitions in that group. The second uses 4. The counts differ because unfinished work can contribute to one transition and stay open in another. Treat a group’s typical completed wait and its oldest open age as separate scheduling indicators.

Group First transition count First median days Second transition count Second median days
Wallets 7 4 4 4
Belts 7 3 4 3.5
Pouches 7 3 5 2

Source in the sample: Work Log, rows 2–9 (columns C–E).

What to check next

If you work weekends differently, decide whether to compare calendar or business days before reusing the calculation. This example uses calendar days throughout. Choose the work stage with jobs ready for the next step.

Try the same review in Jolene.pro using a workbook you already keep.

For each group, show the median calendar days and eligible sample size for Cut to Assembled and Assembled to Finished. Use completed transitions and flag open items separately.

See the workbook method and fictional source tables.

More spreadsheet examples for Leatherworkers.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.