Where Did Your Garden Harvest Logs Skip a Round?
One week the gardener noted zero. The next week nobody filled in the log.
The workbook uses fictional records. North beds has a run of three missing entries from 2026-09-11 to 2026-09-15.
What the records show
The longest run is CHECK-006, CHECK-007, CHECK-008. All three checks are on the calendar and none has a matching Log row. There are 6 scheduled checks with no entry across the workbook. A visual line passing through those dates can make a continuous trend look more certain than the readings are.
| Group | Scheduled | Has log row | Numeric values | No log row |
|---|---|---|---|---|
| North beds | 12 | 9 | 8 | 3 |
| South beds | 12 | 10 | 9 | 2 |
| Containers | 12 | 11 | 11 | 1 |
Source in the sample: Schedule, rows 7–9.
What to check next
Use the schedule date, rather than the next logged timestamp, to identify what was due. Recheck the original diary or export before deciding why the gap happened. Review missed entries before interpreting a quieter patch of the season.
Try the same review in Jolene.pro using a workbook you already keep.
Match the picking schedule to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
See the workbook method and fictional source tables.
More spreadsheet examples for Vegetable gardeners.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.
Try Jolene.pro with a workbook you already use.