Everyday DataHelp ArticlesMaking & Craft

Review stages and wait times for miniature projects (Miniature painters)

A shelf of gray figures tells you where some builds are but not where the queue accumulated.

Prepare the records

Record one row per item with dates for Cleaned, Primed, Painted. The sample uses elapsed calendar days and takes a snapshot on October 1, 2026. If work stops between stages, keep the last observed date.

  • Work Log uses Record ID, Group, Cleaned date, Primed date, Painted date. The example has 24 data rows.

The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.

Check the workbook

  1. Read the last populated stage per ID and count items at each stage as of the review date.
  2. Find the age of open items from the last recorded stage date to the review date.
  3. For a completed transition, subtract the previous stage date. Report the sample count and median for each stage, with incomplete items still listed separately.

Ask Jolene.pro

Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.

As of October 1, 2026, count projects by the last stage recorded. List open IDs and calendar days since each last stage. Show the oldest and cite its source row.

For a second pass:

For each group, show the median calendar days and eligible sample size for Cleaned to Primed and Primed to Painted. Use completed transitions and flag open items separately.

Confirm the result

11 of 24 records are open on October 1, 2026. WORK-001 has waited 26 calendar days since its last logged stage. In Infantry, the median wait from Cleaned to Primed is 4 days. From Primed to Painted, it is 5 days. Start with Work Log, row 2 (columns C–E) and Work Log, rows 2–9 (columns C–E). The separate answer key gives the expected details for both questions.

View the fictional source tables

Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.

Work Log

Excel row Record ID Group Cleaned date Primed date Painted date
2 WORK-001 Infantry 2026-09-01 2026-09-05
3 WORK-002 Infantry 2026-09-04 2026-09-09 2026-09-14
4 WORK-003 Infantry 2026-09-07 2026-09-08 2026-09-14
5 WORK-004 Infantry 2026-09-10 2026-09-12
6 WORK-005 Infantry 2026-09-13
7 WORK-006 Infantry 2026-09-16 2026-09-20 2026-09-23
8 WORK-007 Infantry 2026-09-19 2026-09-24
9 WORK-008 Infantry 2026-09-22 2026-09-23 2026-09-28
10 WORK-009 Vehicles 2026-09-02 2026-09-07 2026-09-13
11 WORK-010 Vehicles 2026-09-05 2026-09-06
12 WORK-011 Vehicles 2026-09-08 2026-09-10 2026-09-12
13 WORK-012 Vehicles 2026-09-11 2026-09-14 2026-09-17
14 WORK-013 Vehicles 2026-09-14 2026-09-18
15 WORK-014 Vehicles 2026-09-17
16 WORK-015 Vehicles 2026-09-20 2026-09-21 2026-09-27
17 WORK-016 Vehicles 2026-09-23 2026-09-25
18 WORK-017 Terrain 2026-09-03 2026-09-04 2026-09-06
19 WORK-018 Terrain 2026-09-06 2026-09-08 2026-09-11
20 WORK-019 Terrain 2026-09-09 2026-09-12
21 WORK-020 Terrain 2026-09-12 2026-09-16 2026-09-21
22 WORK-021 Terrain 2026-09-15 2026-09-20 2026-09-26
23 WORK-022 Terrain 2026-09-18 2026-09-19
24 WORK-023 Terrain 2026-09-21
25 WORK-024 Terrain 2026-09-24 2026-09-27 2026-09-30

More spreadsheet examples for Miniature painters.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.