Everyday DataHelp ArticlesMaking & Craft

Match plan to actual records for fabric estimates (Sewists)

Stripe matching ate more material while another project had no cutting note at all.

Prepare the records

Put one row per ID on Plan and one per ID on Recorded. The example uses September dates for fabric estimates. Use the same units on both sheets. This check works even when one sheet has records the other never received.

  • Plan uses Record ID, Group, Date, Planned fabric used cm. The example has 24 data rows.
  • Recorded uses Record ID, Group, Date, Recorded fabric used cm. The example has 24 data rows.

The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.

Check the workbook

  1. Check that Record ID is unique in each sheet. Pair records by ID, using the group and date as a check on the match.
  2. Keep missing ID, present but blank, measured zero, and recorded-only IDs in separate lists.
  3. Calculate recorded minus plan on pairs with numbers on both sides. Show the shortfall sum separately from the signed net.

Ask Jolene.pro

Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.

Compare the pattern estimate and cutting log. Which planned IDs have no recorded match? Show records with a blank value, actual zeros and recorded-only IDs separately. Cite the source rows.

For a second pass:

For pairs with a numeric value on both sheets, show planned and recorded fabric used cm by group, signed net and shortfall-only sum. Identify the largest confirmed shortfall and cite both cells.

Confirm the result

24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero. The largest confirmed shortfall is 35 on P-018 in Totes. Start with Plan, rows 4, 13, 22; Recorded, rows 7, 19 and Plan, row 19; Recorded, row 19. The separate answer key gives the expected details for both questions.

View the fictional source tables

Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.

Plan

Excel row Record ID Group Date Planned fabric used cm
2 P-001 Aprons 2026-09-02 15
3 P-002 Aprons 2026-09-05 25
4 P-003 Aprons 2026-09-08 35
5 P-004 Aprons 2026-09-11 45
6 P-005 Aprons 2026-09-14 15
7 P-006 Aprons 2026-09-17 25
8 P-007 Aprons 2026-09-20 35
9 P-008 Aprons 2026-09-23 45
10 P-009 Shirts 2026-09-03 20
11 P-010 Shirts 2026-09-06 30
12 P-011 Shirts 2026-09-09 40
13 P-012 Shirts 2026-09-12 50
14 P-013 Shirts 2026-09-15 20
15 P-014 Shirts 2026-09-18 30
16 P-015 Shirts 2026-09-21 40
17 P-016 Shirts 2026-09-24 50
18 P-017 Totes 2026-09-04 25
19 P-018 Totes 2026-09-07 35
20 P-019 Totes 2026-09-10 45
21 P-020 Totes 2026-09-13 15
22 P-021 Totes 2026-09-16 25
23 P-022 Totes 2026-09-19 35
24 P-023 Totes 2026-09-22 45
25 P-024 Totes 2026-09-25 15

Recorded

Excel row Record ID Group Date Recorded fabric used cm
2 P-001 Aprons 2026-09-02 15
3 P-002 Aprons 2026-09-05 20
4 P-004 Aprons 2026-09-11 55
5 P-005 Aprons 2026-09-14 5
6 P-006 Aprons 2026-09-17 30
7 P-007 Aprons 2026-09-20
8 P-008 Aprons 2026-09-23 60
9 X-001 Aprons 2026-09-26 20
10 P-009 Shirts 2026-09-03 20
11 P-010 Shirts 2026-09-06 25
12 P-011 Shirts 2026-09-09 40
13 P-013 Shirts 2026-09-15 10
14 P-014 Shirts 2026-09-18 35
15 P-015 Shirts 2026-09-21 40
16 P-016 Shirts 2026-09-24 65
17 X-002 Shirts 2026-09-27 25
18 P-017 Totes 2026-09-04 25
19 P-018 Totes 2026-09-07 0
20 P-019 Totes 2026-09-10 45
21 P-020 Totes 2026-09-13 25
22 P-022 Totes 2026-09-19 40
23 P-023 Totes 2026-09-22 45
24 P-024 Totes 2026-09-25 35
25 X-003 Totes 2026-09-28 30

More spreadsheet examples for Sewists.

AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.

Try Jolene.pro with a workbook you already use.