Match plan to actual records for cut batches (Woodworkers)
Extra rails do not cover missing stiles even when the total is right.
About this example. This example reviews records. For equipment setup, maintenance or operation, follow the manufacturer’s instructions and your workshop’s safety procedures. Verify measurements and stock before cutting, building or running a machine.
Prepare the records
Put one row per ID on Plan and one per ID on Recorded. The example uses September dates for cut batches. Use the same units on both sheets. This check works even when one sheet has records the other never received.
- Plan uses
Record ID,Group,Date,Planned piece count. The example has 24 data rows. - Recorded uses
Record ID,Group,Date,Recorded piece count. The example has 24 data rows.
The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.
Check the workbook
- Check that Record ID is unique in each sheet. Pair records by ID, using the group and date as a check on the match.
- Keep missing ID, present but blank, measured zero, and recorded-only IDs in separate lists.
- Calculate recorded minus plan on pairs with numbers on both sides. Show the shortfall sum separately from the signed net.
Ask Jolene.pro
Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.
Compare the cut list and completed pieces. Which planned IDs have no recorded match? Show records with a blank value, actual zeros and recorded-only IDs separately. Cite the source rows.
For a second pass:
For pairs with a numeric value on both sheets, show planned and recorded piece count by group, signed net and shortfall-only sum. Identify the largest confirmed shortfall and cite both cells.
Confirm the result
24 IDs were planned. 3 have no record, 1 has a record without a value, and 1 has a measured zero. The largest confirmed shortfall is 7 on P-018 in Panels. Start with Plan, rows 4, 13, 22; Recorded, rows 7, 19 and Plan, row 19; Recorded, row 19. The separate answer key gives the expected details for both questions.
View the fictional source tables
Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.
Plan
| Excel row | Record ID | Group | Date | Planned piece count |
|---|---|---|---|---|
| 2 | P-001 | Rails | 2026-09-02 | 3 |
| 3 | P-002 | Rails | 2026-09-05 | 5 |
| 4 | P-003 | Rails | 2026-09-08 | 7 |
| 5 | P-004 | Rails | 2026-09-11 | 9 |
| 6 | P-005 | Rails | 2026-09-14 | 3 |
| 7 | P-006 | Rails | 2026-09-17 | 5 |
| 8 | P-007 | Rails | 2026-09-20 | 7 |
| 9 | P-008 | Rails | 2026-09-23 | 9 |
| 10 | P-009 | Stiles | 2026-09-03 | 4 |
| 11 | P-010 | Stiles | 2026-09-06 | 6 |
| 12 | P-011 | Stiles | 2026-09-09 | 8 |
| 13 | P-012 | Stiles | 2026-09-12 | 10 |
| 14 | P-013 | Stiles | 2026-09-15 | 4 |
| 15 | P-014 | Stiles | 2026-09-18 | 6 |
| 16 | P-015 | Stiles | 2026-09-21 | 8 |
| 17 | P-016 | Stiles | 2026-09-24 | 10 |
| 18 | P-017 | Panels | 2026-09-04 | 5 |
| 19 | P-018 | Panels | 2026-09-07 | 7 |
| 20 | P-019 | Panels | 2026-09-10 | 9 |
| 21 | P-020 | Panels | 2026-09-13 | 3 |
| 22 | P-021 | Panels | 2026-09-16 | 5 |
| 23 | P-022 | Panels | 2026-09-19 | 7 |
| 24 | P-023 | Panels | 2026-09-22 | 9 |
| 25 | P-024 | Panels | 2026-09-25 | 3 |
Recorded
| Excel row | Record ID | Group | Date | Recorded piece count |
|---|---|---|---|---|
| 2 | P-001 | Rails | 2026-09-02 | 3 |
| 3 | P-002 | Rails | 2026-09-05 | 4 |
| 4 | P-004 | Rails | 2026-09-11 | 11 |
| 5 | P-005 | Rails | 2026-09-14 | 1 |
| 6 | P-006 | Rails | 2026-09-17 | 6 |
| 7 | P-007 | Rails | 2026-09-20 | |
| 8 | P-008 | Rails | 2026-09-23 | 12 |
| 9 | X-001 | Rails | 2026-09-26 | 4 |
| 10 | P-009 | Stiles | 2026-09-03 | 4 |
| 11 | P-010 | Stiles | 2026-09-06 | 5 |
| 12 | P-011 | Stiles | 2026-09-09 | 8 |
| 13 | P-013 | Stiles | 2026-09-15 | 2 |
| 14 | P-014 | Stiles | 2026-09-18 | 7 |
| 15 | P-015 | Stiles | 2026-09-21 | 8 |
| 16 | P-016 | Stiles | 2026-09-24 | 13 |
| 17 | X-002 | Stiles | 2026-09-27 | 5 |
| 18 | P-017 | Panels | 2026-09-04 | 5 |
| 19 | P-018 | Panels | 2026-09-07 | 0 |
| 20 | P-019 | Panels | 2026-09-10 | 9 |
| 21 | P-020 | Panels | 2026-09-13 | 5 |
| 22 | P-022 | Panels | 2026-09-19 | 8 |
| 23 | P-023 | Panels | 2026-09-22 | 9 |
| 24 | P-024 | Panels | 2026-09-25 | 7 |
| 25 | X-003 | Panels | 2026-09-28 | 6 |
More spreadsheet examples for Woodworkers.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.
Try Jolene.pro with a workbook you already use.