Check dates for missing records for reading rounds (Pond keepers)
A sensor row can go missing during a battery change and the chart still draws through the gap.
About this example. This is an example of organizing care or activity records. It does not provide veterinary care or animal behavior advice. Check the animal’s care instructions and consult a veterinarian or qualified trainer when appropriate.
Prepare the records
Keep the sensor schedule on a schedule sheet with one ID per planned check. The log stores what was recorded. Use both sheets to calculate coverage against planned dates.
- Schedule uses
Check ID,Group,Scheduled date. The example has 36 data rows. - Log uses
Check ID,Log date,Status,Water temperature Celsius. The example has 30 data rows.
The sample uses fictional rows and prepared columns. You can adapt these columns to the tracker or export you already keep.
Check the workbook
- Check uniqueness and pair Schedule and Log by Check ID. Sort within each group by scheduled date.
- Separate absent log IDs, explicitly skipped checks, blank measured values and measured zeros.
- Count usable numeric records and report coverage. If using a time chart, keep a gap where the measurement is missing.
Ask Jolene.pro
Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.
Match the sensor schedule to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
For a second pass:
Find skipped checks, recorded rows with blank water temperature celsius and measured zeros. Give their IDs and dates. Keep the separate list of scheduled checks that have no log row.
Confirm the result
Main pond has a run of three missing entries from 2026-09-06 to 2026-09-08. The log separates 1 explicitly skipped check, 1 row with a blank value and 0 recorded zeros. Start with Schedule, rows 7–9 and Log, rows 6, 13. The separate answer key gives the expected details for both questions.
View the fictional source tables
Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.
Schedule
| Excel row | Check ID | Group | Scheduled date |
|---|---|---|---|
| 2 | CHECK-001 | Main pond | 2026-09-01 |
| 3 | CHECK-002 | Main pond | 2026-09-02 |
| 4 | CHECK-003 | Main pond | 2026-09-03 |
| 5 | CHECK-004 | Main pond | 2026-09-04 |
| 6 | CHECK-005 | Main pond | 2026-09-05 |
| 7 | CHECK-006 | Main pond | 2026-09-06 |
| 8 | CHECK-007 | Main pond | 2026-09-07 |
| 9 | CHECK-008 | Main pond | 2026-09-08 |
| 10 | CHECK-009 | Main pond | 2026-09-09 |
| 11 | CHECK-010 | Main pond | 2026-09-10 |
| 12 | CHECK-011 | Main pond | 2026-09-11 |
| 13 | CHECK-012 | Main pond | 2026-09-12 |
| 14 | CHECK-013 | Wildlife pond | 2026-09-01 |
| 15 | CHECK-014 | Wildlife pond | 2026-09-02 |
| 16 | CHECK-015 | Wildlife pond | 2026-09-03 |
| 17 | CHECK-016 | Wildlife pond | 2026-09-04 |
| 18 | CHECK-017 | Wildlife pond | 2026-09-05 |
| 19 | CHECK-018 | Wildlife pond | 2026-09-06 |
| 20 | CHECK-019 | Wildlife pond | 2026-09-07 |
| 21 | CHECK-020 | Wildlife pond | 2026-09-08 |
| 22 | CHECK-021 | Wildlife pond | 2026-09-09 |
| 23 | CHECK-022 | Wildlife pond | 2026-09-10 |
| 24 | CHECK-023 | Wildlife pond | 2026-09-11 |
| 25 | CHECK-024 | Wildlife pond | 2026-09-12 |
| 26 | CHECK-025 | Holding pond | 2026-09-01 |
| 27 | CHECK-026 | Holding pond | 2026-09-02 |
| 28 | CHECK-027 | Holding pond | 2026-09-03 |
| 29 | CHECK-028 | Holding pond | 2026-09-04 |
| 30 | CHECK-029 | Holding pond | 2026-09-05 |
| 31 | CHECK-030 | Holding pond | 2026-09-06 |
| 32 | CHECK-031 | Holding pond | 2026-09-07 |
| 33 | CHECK-032 | Holding pond | 2026-09-08 |
| 34 | CHECK-033 | Holding pond | 2026-09-09 |
| 35 | CHECK-034 | Holding pond | 2026-09-10 |
| 36 | CHECK-035 | Holding pond | 2026-09-11 |
| 37 | CHECK-036 | Holding pond | 2026-09-12 |
Log
| Excel row | Check ID | Log date | Status | Water temperature Celsius |
|---|---|---|---|---|
| 2 | CHECK-001 | 2026-09-01 | Recorded | 17.6 |
| 3 | CHECK-002 | 2026-09-02 | Recorded | 18 |
| 4 | CHECK-003 | 2026-09-03 | Recorded | 18.4 |
| 5 | CHECK-004 | 2026-09-04 | Recorded | 18.8 |
| 6 | CHECK-005 | 2026-09-05 | Skipped | |
| 7 | CHECK-009 | 2026-09-09 | Recorded | 18.4 |
| 8 | CHECK-010 | 2026-09-10 | Recorded | 18.8 |
| 9 | CHECK-011 | 2026-09-11 | Recorded | 19.2 |
| 10 | CHECK-012 | 2026-09-12 | Recorded | 19.6 |
| 11 | CHECK-013 | 2026-09-01 | Recorded | 18.6 |
| 12 | CHECK-014 | 2026-09-02 | Recorded | 19 |
| 13 | CHECK-015 | 2026-09-03 | Recorded, value blank | |
| 14 | CHECK-016 | 2026-09-04 | Recorded | 19.8 |
| 15 | CHECK-017 | 2026-09-05 | Recorded | 20.2 |
| 16 | CHECK-018 | 2026-09-06 | Recorded | 20.6 |
| 17 | CHECK-019 | 2026-09-07 | Recorded | 18.6 |
| 18 | CHECK-021 | 2026-09-09 | Recorded | 19.4 |
| 19 | CHECK-023 | 2026-09-11 | Recorded | 20.2 |
| 20 | CHECK-024 | 2026-09-12 | Recorded | 20.6 |
| 21 | CHECK-025 | 2026-09-01 | Recorded | 19.6 |
| 22 | CHECK-026 | 2026-09-02 | Recorded | 20 |
| 23 | CHECK-027 | 2026-09-03 | Recorded | 20.4 |
| 24 | CHECK-028 | 2026-09-04 | Recorded | 20.8 |
| 25 | CHECK-029 | 2026-09-05 | Recorded | 21.2 |
| 26 | CHECK-030 | 2026-09-06 | Recorded | 21.6 |
| 27 | CHECK-031 | 2026-09-07 | Recorded | 19.6 |
| 28 | CHECK-032 | 2026-09-08 | Recorded | 20 |
| 29 | CHECK-034 | 2026-09-10 | Recorded | 20.8 |
| 30 | CHECK-035 | 2026-09-11 | Recorded | 21.2 |
| 31 | CHECK-036 | 2026-09-12 | Recorded | 21.6 |
More spreadsheet examples for Pond keepers.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.
Try Jolene.pro with a workbook you already use.