Check dates for missing records for birding outings (Birdwatchers)
A trip calendar has more dates than the spreadsheet of submitted checklists.
About this example. These records show reported observations. They do not establish a population trend or confirm a species identification. Keep private property details and precise locations of sensitive wildlife out of shared examples.
Prepare the records
Keep the outing calendar on a schedule sheet with one ID per planned check. The log stores what was recorded. Use both sheets to calculate coverage against planned dates.
- Schedule uses
Check ID,Group,Scheduled date. The example has 36 data rows. - Log uses
Check ID,Log date,Status,Checklists submitted. The example has 30 data rows.
The sample uses fictional rows and prepared columns. If you start with a platform export, consult eBird personal data downloads and map the available columns before using this example.
Check the workbook
- Check uniqueness and pair Schedule and Log by Check ID. Sort within each group by scheduled date.
- Separate absent log IDs, explicitly skipped checks, blank measured values and measured zeros.
- Count usable numeric records and report coverage. If using a time chart, keep a gap where the measurement is missing.
Ask Jolene.pro
Open the workbook in Jolene.pro and include the relevant data tabs. Ask for the record IDs and source cells.
Match the outing calendar to the log. Where are the longest consecutive scheduled gaps by group? List the missing check IDs and dates and show the original schedule rows.
For a second pass:
Find skipped checks, recorded rows with blank checklists submitted and measured zeros. Give their IDs and dates. Keep the separate list of scheduled checks that have no log row.
Confirm the result
Marsh loop has a run of three missing entries from 2026-09-11 to 2026-09-15. The log separates 1 explicitly skipped check, 1 row with a blank value and 1 recorded zero. Start with Schedule, rows 7–9 and Log, rows 6, 13, 30. The separate answer key gives the expected details for both questions.
View the fictional source tables
Use the table headings as your spreadsheet headers and keep the original row order to follow references in the example.
Schedule
| Excel row | Check ID | Group | Scheduled date |
|---|---|---|---|
| 2 | CHECK-001 | Marsh loop | 2026-09-01 |
| 3 | CHECK-002 | Marsh loop | 2026-09-03 |
| 4 | CHECK-003 | Marsh loop | 2026-09-05 |
| 5 | CHECK-004 | Marsh loop | 2026-09-07 |
| 6 | CHECK-005 | Marsh loop | 2026-09-09 |
| 7 | CHECK-006 | Marsh loop | 2026-09-11 |
| 8 | CHECK-007 | Marsh loop | 2026-09-13 |
| 9 | CHECK-008 | Marsh loop | 2026-09-15 |
| 10 | CHECK-009 | Marsh loop | 2026-09-17 |
| 11 | CHECK-010 | Marsh loop | 2026-09-19 |
| 12 | CHECK-011 | Marsh loop | 2026-09-21 |
| 13 | CHECK-012 | Marsh loop | 2026-09-23 |
| 14 | CHECK-013 | Meadow loop | 2026-09-01 |
| 15 | CHECK-014 | Meadow loop | 2026-09-03 |
| 16 | CHECK-015 | Meadow loop | 2026-09-05 |
| 17 | CHECK-016 | Meadow loop | 2026-09-07 |
| 18 | CHECK-017 | Meadow loop | 2026-09-09 |
| 19 | CHECK-018 | Meadow loop | 2026-09-11 |
| 20 | CHECK-019 | Meadow loop | 2026-09-13 |
| 21 | CHECK-020 | Meadow loop | 2026-09-15 |
| 22 | CHECK-021 | Meadow loop | 2026-09-17 |
| 23 | CHECK-022 | Meadow loop | 2026-09-19 |
| 24 | CHECK-023 | Meadow loop | 2026-09-21 |
| 25 | CHECK-024 | Meadow loop | 2026-09-23 |
| 26 | CHECK-025 | Woodland loop | 2026-09-01 |
| 27 | CHECK-026 | Woodland loop | 2026-09-03 |
| 28 | CHECK-027 | Woodland loop | 2026-09-05 |
| 29 | CHECK-028 | Woodland loop | 2026-09-07 |
| 30 | CHECK-029 | Woodland loop | 2026-09-09 |
| 31 | CHECK-030 | Woodland loop | 2026-09-11 |
| 32 | CHECK-031 | Woodland loop | 2026-09-13 |
| 33 | CHECK-032 | Woodland loop | 2026-09-15 |
| 34 | CHECK-033 | Woodland loop | 2026-09-17 |
| 35 | CHECK-034 | Woodland loop | 2026-09-19 |
| 36 | CHECK-035 | Woodland loop | 2026-09-21 |
| 37 | CHECK-036 | Woodland loop | 2026-09-23 |
Log
| Excel row | Check ID | Log date | Status | Checklists submitted |
|---|---|---|---|---|
| 2 | CHECK-001 | 2026-09-01 | Recorded | 4 |
| 3 | CHECK-002 | 2026-09-03 | Recorded | 7 |
| 4 | CHECK-003 | 2026-09-05 | Recorded | 10 |
| 5 | CHECK-004 | 2026-09-07 | Recorded | 4 |
| 6 | CHECK-005 | 2026-09-09 | Skipped | |
| 7 | CHECK-009 | 2026-09-17 | Recorded | 10 |
| 8 | CHECK-010 | 2026-09-19 | Recorded | 4 |
| 9 | CHECK-011 | 2026-09-21 | Recorded | 7 |
| 10 | CHECK-012 | 2026-09-23 | Recorded | 10 |
| 11 | CHECK-013 | 2026-09-01 | Recorded | 5 |
| 12 | CHECK-014 | 2026-09-03 | Recorded | 8 |
| 13 | CHECK-015 | 2026-09-05 | Recorded, value blank | |
| 14 | CHECK-016 | 2026-09-07 | Recorded | 5 |
| 15 | CHECK-017 | 2026-09-09 | Recorded | 8 |
| 16 | CHECK-018 | 2026-09-11 | Recorded | 2 |
| 17 | CHECK-019 | 2026-09-13 | Recorded | 5 |
| 18 | CHECK-021 | 2026-09-17 | Recorded | 2 |
| 19 | CHECK-023 | 2026-09-21 | Recorded | 8 |
| 20 | CHECK-024 | 2026-09-23 | Recorded | 2 |
| 21 | CHECK-025 | 2026-09-01 | Recorded | 6 |
| 22 | CHECK-026 | 2026-09-03 | Recorded | 9 |
| 23 | CHECK-027 | 2026-09-05 | Recorded | 3 |
| 24 | CHECK-028 | 2026-09-07 | Recorded | 6 |
| 25 | CHECK-029 | 2026-09-09 | Recorded | 9 |
| 26 | CHECK-030 | 2026-09-11 | Recorded | 3 |
| 27 | CHECK-031 | 2026-09-13 | Recorded | 6 |
| 28 | CHECK-032 | 2026-09-15 | Recorded | 9 |
| 29 | CHECK-034 | 2026-09-19 | Recorded | 6 |
| 30 | CHECK-035 | 2026-09-21 | Recorded | 0 |
| 31 | CHECK-036 | 2026-09-23 | Recorded | 3 |
More spreadsheet examples for Birdwatchers.
AI and example data. The sample records are fictional and are provided to show the spreadsheet method. Jolene.pro uses AI and may misread data, make calculation errors or give incomplete answers. Check the original records, source references and calculations before relying on an answer.